Project:

Rural road project, Lang Tu, Duong Huy, Viet Yen district, Bac Giang province.

Length 2,000m, width 4m.

Standard Design: Modyn Elastic Eyc> = 120 Mpa.

Acceptance test achieved: Modyn elastic b / q: 183 MPa.

Structural: Reinforcement of existing road bed with TS additive and cement, reinforced layer 20cm to 22cm. The surface of the reinforcing layer is covered with emulsion and 2 cm thick stone.

  • Investor:
    People’s Committee of Viet Yen district, Bac Giang province.
  • Contractor:
    Joint venture of Hai Tho Construction Company and VIETRACO.

Project details:

Investor

Investor:
People’s Committee of Viet Yen district, Bac Giang province.

Technology direction:
Mr. Nguyen Dang Hung.

Construction supervision:
Mr. Nguyen Quoc Anh.

Contractor:
Joint venture of Hai Tho Construction Company and VIETRACO.

Project details
  • Size of road: Length 2,000m, width 4m.
  • Design standard: Eyc> = 120 Mpa.
  • Acceptance test achieved: Modyn elastic b / q: 183 MPa.
  • Structural: Reinforcement of existing road bed with TS additive and cement, reinforced layer 20cm to 22cm. The surface of the reinforcing layer is covered with emulsion and 2 cm thick stone.
Completion time

Construction and completion time:
From 18/08/2016 to 30/08/2016.