• Typical project:

    Construction of motor vehicle gathering yard and internal road system in Co Ma Dam, Laos.

Project:

Construction of motor vehicle gathering yard and internal road system in Co Ma Dam, Laos.

Scale: Total project 80,000 m2 including yard and internal road system with road width from 6 meters to 12 meters.

Reinforcement thickness from 0.25mm to 0.30mm.

After the reinforcement is completed, the road surface is covered with 3 layers of semi-permeable asphalt with a thickness of 2cm to 2.5cm.

  • Investor:

    Lao Ministry of Defense.

  • Construction unit:

    Tha Vi Xay One Member Company Limited.

The completed project has been verified with good results and has been put into use and monitored since 2018 until now.

Projest details:

Investor

Investor:
Lao Ministry of Defense.

Technology direction:
Mr. Nguyen Dang Hung.

Construction supervision:
TS Polymer Company Limited.
Mr. Nguyen Quoc Anh.

Construction unit:
Tha Vi Xay One Member Company Limited.

Project details
  • Scale: Total project 80,000 m2 including yard and internal road system with road width from 6 meters to 12 meters.
  • Reinforcement thickness from 0.25mm to 0.30mm.
  • After the reinforcement is completed, the road surface is covered with 3 layers of semi-permeable asphalt with a thickness of 2cm to 2.5cm.
  • The completed project has been verified with good results and has been put into use and monitored since 2018 until now.
Completion time

Construction and completion time:

30 days, August 2018.