Project:
Construction of motor vehicle gathering yard and internal road system in Co Ma Dam, Laos.
Scale: Total project 80,000 m2 including yard and internal road system with road width from 6 meters to 12 meters.
Reinforcement thickness from 0.25mm to 0.30mm.
After the reinforcement is completed, the road surface is covered with 3 layers of semi-permeable asphalt with a thickness of 2cm to 2.5cm.
- Investor:
Lao Ministry of Defense.
- Construction unit:
Tha Vi Xay One Member Company Limited.
The completed project has been verified with good results and has been put into use and monitored since 2018 until now.
Projest details:
Investor:
Lao Ministry of Defense.
Technology direction:
Mr. Nguyen Dang Hung.
Construction supervision:
TS Polymer Company Limited.
Mr. Nguyen Quoc Anh.
Construction unit:
Tha Vi Xay One Member Company Limited.
- Scale: Total project 80,000 m2 including yard and internal road system with road width from 6 meters to 12 meters.
- Reinforcement thickness from 0.25mm to 0.30mm.
- After the reinforcement is completed, the road surface is covered with 3 layers of semi-permeable asphalt with a thickness of 2cm to 2.5cm.
- The completed project has been verified with good results and has been put into use and monitored since 2018 until now.
Construction and completion time:
30 days, August 2018.