• Typical project:

    Ho Chi Minh Road section of Km 634 to 640 in Nghia Dan district, Nghe An province.

Project:

Ho Chi Minh Trail Improvement Project of Km 634 to 640 in Nghia Dan District, Nghe An Province.

Size: 6km long, 6m wide, reinforced concrete thickness of 0.25 meters, Asphal concrete mat surface as designed Highway.

Works by the Department of Roads 2 Ministry of Transport as the investor, Bien Dong Co., Ltd. is the main contractor, Vietraco Transport Engineering JSC is the subcontractor responsible for the construction of reinforcement Local materials with TS additive combined with cement as road bed.

The project has been tested and tested to date and in 2018 will continue to implement this technology on many routes in the Ho Chi Minh Road.

  • Investor:
    Ministry of Transportation of Vietnam.
  • Construction unit:
    Bien Dong Company Limited.
    VIETRACO Transportation Joint Stock Company.

Project details:

Investor

Investor:
Ministry of Transportation of Vietnam

Technology direction:
Mr. Nguyen Dang Hung.

Construction supervision:
Mr. Nguyen Quoc Anh.

Construction unit:
Bien Dong Company Limited.
VIETRACO Transportation Joint Stock Company.

Project details
  • Size: 6km long, 6m wide, reinforced concrete thickness of 0.25 meters, Asphal concrete mat surface as designed Highway.

  • Works by the Department of Roads 2 Ministry of Transport as the investor, Bien Dong Co., Ltd. is the main contractor, Vietraco Transport Engineering JSC is the subcontractor responsible for the construction of reinforcement Local materials with TS additive combined with cement as road bed.
  • The project has been tested and tested to date and in 2018 will continue to implement this technology on many routes in the Ho Chi Minh Road.

Completion time

Construction and completion time:

April 2017.