Project:

Road project of Sen Ho, Van Trung, Viet Yen district, Bac Giang province

The project is invested by Bac Giang People’s Committee.

This is a pilot project in Bac Giang and achieved the above-mentioned initial results.

Design standard: Eyc> = 120 Mpa.

Acceptance test achieved: Modyn elastic b / q: 150 MPa.

  • Investor:
    Bac Giang People’s Committee.
  • Contractor:
    Joint venture of Hai Tho Construction Company and VIETRACO.

Project details:

Investor

Investor:
People’s Committee of Viet Yen district, Bac Giang province.

Technology direction:
Mr. Nguyen Dang Hung.

Construction supervision:
Mr. Nguyen Quoc Anh.

Contractor:
Joint venture of Hai Tho Construction Company and VIETRACO.

Project details
  • Size of road: Length 2,000m, width 4m.
  • Design standard: Eyc> = 120 Mpa.
  • Acceptance test achieved: Modyn elastic b / q: 150 MPa.
  • Structure: The road bed is made of 60% of base grade and 40% of hill soil. Base thickness is reinforced with cement + TS Additive is 18cm.
Completion time

Construction and completion time:
November 2016.